Water utility · 2023
PBA Bukit Gedung Pump House PLC Panel Upgrade
PLC panel expansion and optimisation at PBAPP Bukit Gedung Pumping Station, Penang. The entire upgrade was completed within an 8-hour downtime window without disrupting water supply operations — demonstrating Flow Solution's capability for precision execution on live critical infrastructure.